August 2017 Construction Update

  |     |   Uncategorized

Construction Progress

Site Work

Installation of new construction trailer, maintenance of existing perimeter fencing, overall site cleanup, removal of trash and weeds, patching of sidewalk on Main Street. Installation of various safety control measures and 24 hour lighting in both buildings. Reestablishments of gates. Underground stormwater piping and catch basins were installed between the buildings along vacated Spencer Ave. Removal of existing sanitary lines from old Village Hall. Additionally, coordination meetings with the utility companies (specifically ComEd) to discuss electrical feeds and transformer locations for the project. This is currently underway with engineering.

West Building

Perimeter footings and foundation walls at the retail space along Burlington. Masonry at interior stairwells and elevator shafts. Structural steel installation needed for precast. Precast concrete at the stairwell corners.

East Building

Masonry at interior stairwells and elevator shafts. Structural steel at garage entry and stairwells. Precast concrete at garage level one.

More Information

We look forward to working with the community to bring this new development to completion. For general questions or comments, please contact us at marqonmain.com.

Leave a reply

required

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>